Visit of a Dimac technician to your site.
General check-up of the machine: parts feeding system – control stations conditions and setup – Parts evacuation in batches – Electric cabinet and plants.
Check-up of the safety devices and signalization systems.
Electric plant and pneumatic plant check with efficiency verification.
Check-up of any sensors, probes, motors, and controllers.
Vision system full check-up: Cameras – Optics – Illumination devices – Electronic controllers.
Remote connection check-up with the vision system controller, hard-disk cleaning and defrag data files, and image backup with optimization of the system configuration.